The complete design-to-completion project is
actually composed of several main "partners”– the main partners
being the Owner, Architect, Engineering and Construction. Each
partner works to their project schedule and all partners work
within a master project timeline. The three technical partners
may be departments within the same firm or they may be different
firms. |
|
|
Date: TBA
Location: Tulsa, OK
Time: 5PM - 9PM
Fee: $95
.4 CEUs/Arch:
4 CEUs-hsw/4 PDHs
|
|
 |
 |
|
|
|
To be successful (win-win for all partners in the
process) it helps to understand the basic process used by each
partner in the overall project. This course examines the
process used by the last partner in the process, the partner
with the most outside observable results and the partner always
faced with the final deadline pressures.
This is a practical examination of the construction management
scheduling process, its structure and dynamics, and how it
interacts and responds to changes.
1. The six step scheduling processes:
a. What are activities
b. How are durations calculated
c. How are activities related
d. How is a schedule calculated
e. Review and Analyzing the Schedule
f. Implementing the Schedule
2. The Loaded Schedule
3. Crashing the Schedule
4. Updating the Schedule |